Skunk River Bridge Repair
Project Scope
Commenced: 2014
Completed: 2014
Client: Phoenix Group 2011 (Constance Lake First Nation)
Mahiihkanuk / Nuna Joint Venture was awarded the contract for the replacement of the Skunk River wooden bridge deck for Constance Lake First Nation. MNJV’s scope included: supply and prefabrication of wooden bridge deck; selective demolition and removal of existing bridge deck; and installation of a new bridge deck on existing structure.