Constance Lake Water Treatment Plant
Project Scope
Commenced: 2015
Completed: 2016
Client: Constance Lake First Nation
Constance Lake First Nation, located on the shores of Constance Lake near Hearst, ON, commissioned a new water treatment plant including treatment equipment, connection to existing communal system, and partial decommissioning of the existing water treatment plant. Generally, the new water treatment plant included pre-engineering building and foundation / reservoir, filters, pumps, chemical feed equipment, natural gas emergency generator, HVAC, electrical, and controls. Mahiihkanuk Nuna / Tribury Joint Venture (MNTJV), a partnership with Mahiihkanuk Construction Limited Partnership (MFN) and Tribury Construction (1995) Inc., completed the following scope: excavation of backfill for the new water treatment plant; installation of site services (water, storm, and sanitary sewer); and new pavement structure.